New HPU Facility — Pavlodar
Client:
Air Liquide Engineering & Construction
Scope:
Engineering design and rental of scaffolding and formwork systems
Materials:
PERI UP modular scaffolding system/ TRIO ST formwork
Volume:
– Scaffolding materials: 140 tons
– Formwork: 50 tons
Period:
2025 – 2026
The project required engineering design and provision of scaffolding and formwork systems to support construction activities at an industrial facility. System layout and load configurations were developed according to structural and safety requirements defined within project documentation. Supply and deployment were performed within the approved schedule.



