FGP Group

New HPU Facility Pavlodar

Client:
Air Liquide Engineering & Construction

Scope:
Engineering design and rental of scaffolding and formwork systems

Materials:
PERI UP modular scaffolding system/ TRIO ST formwork

Volume:
– Scaffolding materials: 140 tons
– Formwork: 50 tons

Period:
2025 – 2026

The project required engineering design and provision of scaffolding and formwork systems to support construction activities at an industrial facility. System layout and load configurations were developed according to structural and safety requirements defined within project documentation. Supply and deployment were performed within the approved schedule.