KTL Switchgear Upgrade (KSU)
Client:
Tengizchevroil
Scope:
Engineering design and supply of scaffolding systems
Materials:
PERI UP Flex modular scaffolding system
Volume:
110 tons
Year:
2024
The project included engineering design and supply of scaffolding systems to support upgrade works at an industrial facility. System configuration was developed in accordance with structural layout and operational access requirements. Delivery was completed within defined project parameters.



