Compensator Comb Leakage Repair
Client:
Kazakhstan Petrochemical Industries
Scope:
Composite repair works
Materials:
Epoxy Putty / Epoxy Resin part A + part B
Execution Time:
72 hours
Year:
2025
The project involved composite repair works performed to address equipment leakage under operating industrial conditions. Repair methodology and materials were applied in accordance with defined technical requirements. The scope was completed within the specified execution timeframe.


