FGP Group

Qyzylorda 240 MW CHP Plant

Client:
AKSA Energy

Scope:
Engineering, supply and supervision of insulation systems

Materials:
Mineral wool, aluminum jacketing and thermal covers

Volume:
– Insulation: 85,000 m²
– Thermal covers: 400 units

Period:
2025–2026

The Qyzylorda 240 MW CHP Plant project involved engineering, supply and supervision of insulation systems for energy infrastructure operating in industrial conditions. System configuration and material selection were aligned with project specifications and installation requirements. Activities were executed within the defined technical scope and timeline.